Government Contract | Alabama
EXTERIOR WATERPROOFING AND SEALING FOR MATERIAL SCIENCE BUILDING, M. DOUGLAS AUDITORIUM AND OPTICS BUILDING

Bid Information


Bid Alert No: 00000534249

Bid Title: EXTERIOR WATERPROOFING AND SEALING FOR MATERIAL SCIENCE BUILDING, M. DOUGLAS AUDITORIUM AND OPTICS BUILDING

Agency Bid No. Title: B002424

Received Date: 04/07/2016

Close Date: 04/26/2016

Purchase Type: Not Stated

Delivery Point:

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference 04/12/2016 11:00 AM

Specifications

Specifications include, but are not limited to:Scope of Work (Base Bid): 1. Cut out all sealants at window, door, louver and other penetration perimeters. Grind substrates to completely clean conditions. Install new backer rod or bond breaker as applicable. Install new MS Joint Sealant. 2. Cut out all sealants at concrete expansion joints. Grind substrate to clean concrete. Install new backer rod. Install new Polyether Joint Sealant. 3. Cut back or remove gasket material at all window frame to glass joints to allow for proper installation of new sealant. Install Silicon Sealant. 4. Clean all window frame to frame joints. Install Silicon sealant in a band aid fashion over metal to metal joints 5. Grind out concrete crack as shown in pictures. Grind to 3/8 x 3/8 minimum. Install bond breaker at back of joint. Install Polyether Joint Sealant 6. Clean all exterior vertical concrete surfaces. Use appropriate PROSOCO or Dietrich cleaners. This method shall be approved via a mock up prior to commencement of work. Pressure washing only IS NOT ACCEPTABLE.Cuttingmarksw a n d m a r k s i n t h e b u i l d i n g s u r f a c e s w i l l N O T B E A C C E P T A B L E . 7. Protection of the Glass and Window frames will be provided by the contractor as required. 8. After substrate is dried, Install one (1) coat of sealer at 75-200 sf per gal with a wide brush or spray until surface appears shiny and wet. Apply second coat within 10 minutes of application of the first coat at 75-200 sf per gal. 9. Entryways may not be blocked off without prior approval of the facilities management team. Pedestrian protection will be required in some areas to keep the building occupied and exits functioning. This shall all be coordinated with facilities prior to start of work. 10. Water and power will be provided by UAH at no charge to the contractor. 11. Provide submittals to UAH Facilities within 7 days of award of contract. 12. Time of the contract: The Material Science Building and M Douglas Auditorium shall be completed in 90 days. If the option of the Optics Building is to be repaired the time is 90 days also. This too shall be coordinated with the facilities team prior to starting

Bid Related Documents

Download Document

Product Code: 96177

Agency Information


Issuing Agency: University of Alabama - Huntsville

State: Alabama

Agency Type: State and Local

Contact: Judy Curtis Procurement Services, 301 Sparkman Drive, Huntsville, Alabama, 35899

Phone: 256-824-2552

Email: curtisj@uah.edu

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW