Government Contract | Connecticut
Engineering Services for Permitting & Design

Bid Information

Bid Alert No: 00000406329

Bid Title: Engineering Services for Permitting & Design

Agency Bid No. Title: 2015-16

Received Date: 10/30/2015

Close Date: 11/18/2015

Purchase Type: Not Stated

Delivery Point: Colchester, Connecticut

Delivery Date: Not Stated

Special Notices: Performance Bond Required: 100%, Payment Bond Required: 100%, Other: Insurance Required


Specifications include, but are not limited to:This contract shall be defined as, but not limited to:a. The general scope of the project is as follows: The Colchester Sewer and WaterCommission has conducted preliminary mapping and coordinated with the State ofConnecticut Department of Health in order to and for siting a new well with a withdrawl rate of over 50 gallon per minute. The new well is depicted to be located withinthe radius required to be considered a replacement well and is commonly known asWell 3A. The preliminary mapping and August 31, 2015 letter from the Departmentof Health are incorporated within this RFP for informational purposes. The consultantchosen shall provide coordinated engineering, mapping, environmental, and permitassistance services required to successfully obtain a Well Site Suitability Certificatefor Well 3A and if required design services for the well pump, controls and pipingalterations and additions that are required to incorporate Well 3A into the dailyoperation ofthe Taintor Hill Road filtration plant while leaving Well 3 in reserve.b. It is envisioned that the entire project process should follow: 1) Well Site SuitabilityCertification; 2)Contract bid/and award for drilling of test wells, 3) Well and Pumpdesign based upon well driller results with associated piping, building and equipmentdesign; 4) Installation of Well 3A with yield tests; 5) Installation of Piping,equipment and buildings; 6) Activation of Well 3A into the Taintor Hill FiltrationPlant Operations. Should funds allow or become available, additional work may beadded to the project. The Town also reserves the right to deduct estimated work asrequired. The quantities listed are estimated for the envisioned work at the TaintorHill Road Well Field and Filtration Plant. At all required bench mark points.c. The consultant price quotes shall consist of furnishing all expertise, materials,personal protection equipment, sub-contractor costs, required testing, labor,supervision, equipment, tools, supplies, and all other expenses in order to conduct thework.d. Bidders are required attend any mandatory pre-bid meetings and to perform on siteinspections of the areas where systems are to be installed in accordance to theinstructions at the pre-bid meeting, and be familiar with the work areas. Siteinspections are to be coordinated with staff. No unwarned site inspections shall bepermitted. No additional payments shall be made for work that should be apparent tocompetent installers. Should conflict occur between contractor and project staff inregard to location of equipment, project staff shall have the final determination.

Bid Related Documents

Download Document

Product Codes: 92518, 92505

Agency Information

Issuing Agency: Town of Colchester

State: Connecticut

Agency Type: State and Local

Contact: James Paggioli 127 Norwich Ave, Colchester, Connecticut, 51230

Phone: 860-537-7288



FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing