Government Contract | Wisconsin
Engineering Consulting Services for Madison Parking Utility Structures

Bid Information


Bid Alert No: 00000440706

Bid Title: Engineering Consulting Services for Madison Parking Utility Structures

Agency Bid No. Title: 8443-0-2015-JA

Received Date: 12/15/2015

Close Date: 01/25/2016

Purchase Type: Not Stated

Delivery Point: Madison, Wisconsin

Delivery Date: Not Stated

Special Notices: Questions Due By 01/04/2016

Specifications

Specifications include, but are not limited to:Based on previous condition evaluations and long range planning, the City of Madison currently has thefollowing amounts budgeted for the given year:2016 - $1,453,000 budgeted. This budget amount includes restoration (concrete repair, sealantreplacement, membrane replacement, traffic coating application, silane sealer application, etc.), structuralcondition evaluations, A/E Design and Construction Administration. Electrical and lighting upgrades arealso included. Restoration projects slated to be completed in 2016 include: Government East Garage - $17,000 repair budget State Street Capitol Garage - $872,000 repair budget including $750,000 electrical upgrade andreplacing lighting throughout with LED (plans and specs for electrical and lighting upgradepreviously completed) State St. Campus (Lake) Garage - $225,000 repair budget State St. Campus (Frances) Garage - $40,000 repair budget Overture Center Garage - $216,000 repair budget, silane sealer, and design for replacing lightsthroughout with LED Capitol Square North Garage - $83,000 repair budget2017 - $669,000 budgeted. This budget amount consists of restoration (concrete repair, sealantreplacement, traffic coating application, silane sealer application, etc.), structural condition evaluations,A/E Design and Construction Administration and electrical and lighting work.Restoration projects slated to be completed in 2017 include: State Street Capitol Garage - $68,000 repair budget State St. Campus (Lake) Garage - $100,000 repair budget Capitol Square North Garage - $118,000 repair budget Overture Center Garage - $320,000 repair budget includes $280,000 for replacing lightsthroughout with LED State St. Campus (Frances) Garage - $63,000 (includes $30,000 for relighting design)2018 $852,000 budgeted. This budget amount consists of restoration (concrete repair, sealantreplacement, traffic coating application, silane sealer application, etc.), structural condition evaluationsA/E Design and Construction Administration, and electrical and lighting work.Restoration projects slated to be completed in 2018 include: State Street Capitol Garage - $189,000 repair budget State St. Campus (Lake) Garage - $115,000 repair budget

Bid Related Documents

Download Document

Bid Related Attachments

Download Attachment Download Attachment

Product Code: 92518

Agency Information


Issuing Agency: City of Madison

State: Wisconsin

Agency Type: State and Local

Contact: 210 Martin Luther King Jr. Blvd., Room 115, Madison, Wisconsin, 53703

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW