Government Contract | Minnesota
Engineering and Design Services for 8 th Street Reconstruction

Bid Information

Bid Alert No: 00000453233

Bid Title: Engineering and Design Services for 8 th Street Reconstruction

Agency Bid No. Title: RFP 2015-85

Received Date: 01/06/2016

Close Date: 01/29/2016

Purchase Type: services end date December 31, 2020

Delivery Point:

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Optional 01/15/2016 10:00 AM


Specifications include, but are not limited to:This section of 8th Street serves as the primary eastbound corridor for many transit routes through downtown. As described in Access Minneapolis, a key strategy for transitservicedo w n t o w n i s t o , c o n s o l i d a t e c o m m u t e r s e r v i c e o n t o s t r e e t s w h e r e transit is given modal priority and resources for transit services and facilities can be c o n c e n t r a t e d . T h e i m p l e m e n t a t i o n o f A r t e r i a l B u s R a p id Transit (ABRT) service in the region will result in 8 th Street serving as the route through downtown for at least two ABRT lines the C and D Lines. The proposed project will fully reconstruct 8 th Street from Hennepin to Chicago Avenues with new curb and gutter, pavement, upgraded signals, landscaping, pedestrian-level street lighting, and sidewalks. Sidewalk curb extensions are planned to accommodate ABRT stations at select locations along the corridor to provide space for a paid fare zone and required transit infrastructure, while maintaining an adequate pedestrian throughway. Some parking and loading zone removal and/or peak-hour parking restrictions may be required.

Product Code: 92518

Agency Information

Issuing Agency: City of Minneapolis

State: Minnesota

Agency Type: State and Local

Contact: 330 2nd Avenue South, Suite 552, Minneapolis, Minnesota, 55401



FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing