Government Contract | California
Donald C Tillman Water Reclamation Plant Chlorine-Contact Tank High-Pressure Effluent System Improvement & Primary Tanks HPE-Piping Replacement

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information


Bid Alert No: 00001078391

Bid Title: Donald C Tillman Water Reclamation Plant Chlorine-Contact Tank High-Pressure Effluent System Improvement & Primary Tanks HPE-Piping Replacement

Agency Bid No. Title: SZD11285

Received Date: 09/04/2017

Close Date: 10/04/2017

Purchase Type: Not Stated

Delivery Point: Los Angeles, California

Delivery Date: Not Stated

Special Notices: Site-Walk Optional 09/05/2017 10:00 AM, Pre-Bid Conference Optional 09/05/2017 01:00 PM

Specifications

Specifications include, but are not limited to:DCT Primary Tank HPE Piping Replacement (CIP 8637) will replace the existing corroded copper HPE pipinglocated at the Primary Settling Tanks located at the DCT water reclamation plant with new piping, as well asinstalling three surge tanks on the HPE loop system.The DCTWRP Chlorine Contact Tanks HPE System Improvements project (CIP 8649) will provide for thereplacement of the High Pressure Effluent (HPE) pipe and hand valve system in the Chlorine Contact Tankswith new pipe and hand valves.

Product Code: 91359

Agency Information


Issuing Agency: City of Los Angeles

State: California

Agency Type: State and Local

Contact: Sean Zahedi, Wastewater Conveyence Engineering Division Hyperion Treatment Plant, 12000 Vista del Mar, Playa Del Rey, California, 90293

Phone: 213-485-4590

Email: sean.zahedi@lacity.org

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW