Government Contract | Georgia
DAWSON FOREST PIPE REHABILITATION

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information


Bid Alert No: 00000530512

Bid Title: DAWSON FOREST PIPE REHABILITATION

Agency Bid No. Title: 276-16

Received Date: 04/01/2016

Close Date: 04/29/2016

Purchase Type: Not Stated

Delivery Point:

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Mandatory 04/15/2016 02:30 PM, Questions Due By 04/19/2016 01:00 PM

Specifications

Specifications include, but are not limited to:Contractors must provide all equipment, materials and labor to complete the scope of work. Structure #1082: Existing structure is a 48 Reinforced Concrete Pipe (RCP). Existing pipe is in good condition with the exception of the downstream invert. T o t a l p i p e l e n g t h e x t e n d s a p p r o x i m a t e l y 1 2 7 i n l e n g t h w i t h a s e p a r a t e d j o i n t a t the end wall downstream side. The existing pipe invert at the upstream side isBid #276-16 IFB Dawson Forest Pipe Rehabilitation Page 9 approximately12fromtheedgeofshoulderand a p p r o x i m a t e l y 1 5 f r o m t h e e d g e on the downstream side. The Contractor will be required to: Backfill eroded areas to the west and north of the downstream headwall. Material shall meet 95% compaction and reports. Contractor will be required to include all shoring, trucking in and out, traffic control, backfill material, to complete the job in its entirety. Contractor will be required to provide compaction reports to 95% to the Dawson County Public Works Director. R e p l a c e t w o s e c t i o n s o f 4 8 R C P a n d a c o n c r e t e w i n g w a l l / e n d w a l l . Grout each pipe section connection from the inside of the existing pipe. Contractor will be responsible for implementing and maintaining Erosion Control BMP Standards as outlined in the State of Georgia Green Book. By-pass pump shall be the responsibility of the contractor. Method shall be approved by the Public Works Director. All materials, pavement specification and traffic control shall meet the Georgia Department of Transportation guidelines and specifications and current MUTCD manual. Structure #1087: The current structure is a 60 Corrugated Metal Pipe (CMP) and should be considered fully deteriorated. A live stream flows through the pipe. The u p s t r e a m i n v e r t i s a p p r o x i m a t e l y 3 0 d e e p a n d t h e d o w n s t r e a m i n v e r t i s a p p r o x i m a t e l y 5 0 d e e p . T h e p i p e e x t e n d s a p p r o x i m a t e l y 1 2 0 i n v e r t t o i n v e r t . T h e current pipe shall be cleaned of all debris and sediment prior to lining. The Contractor will be required to: Provide a jointless cured in place pipe. If necessary, Contractor will take in to consideration the length and size of pipe t o d e t e r m i n e i f w e t o u t o v e r t h e h o l e ( O T H ) a s t h e y a r e b e i n g i n v e r t e d because they are too heavy to transport. Contractor will be responsible for following all related ASTM F-1216 and associated specifications and standards. By-pass pump shall be the responsibility of the contractor. Method shall be approved by the Public Works Directo

Product Codes: 91339, 91345

Agency Information


Issuing Agency: County of Dawson

State: Georgia

Agency Type: State and Local

Contact: Davida Simpson Purchasing Department, 76 Howard Avenue, East; Suite 120, Dawsonville, Georgia, 30534

Phone: 706-344-3501

Fax: 706-531-2728

Email: dsimpson@dawsoncounty.org

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW