Government Contract | Wisconsin
Construction Manager for Highway Shop Facility

Bid Information

Bid Alert No: 00000429032

Bid Title: Construction Manager for Highway Shop Facility

Agency Bid No. Title: Not Stated

Received Date: 12/02/2015

Close Date: 12/21/2015

Purchase Type: Not Stated

Delivery Point: Calumet County, Wisconsin

Delivery Date: Not Stated

Special Notices: Warranty Required


Specifications include, but are not limited to:Construction of a new highway garage and associated site facilities for the Calumet County Highway Department at 241 E. Chestnut Street, Chilton, WI 53014-1554. The existing garage will be demolished and a new garage facility will be developed in the same approximate location. The garage's room program will include heated parking, space for 29 vehicles, six drive-through bays, parts storage, welding bay, signage, truck bay, hydraulics and hose shop, bulk fluids, manual truck wash, lockers, flex space, superintendents offices, archives, records, office manager's station, commissioner's offices, committee meeting room and lobby area. Site facilities will include paved areas, parking, storm-water detention, utilities, lighting and landscaping. In addition, a fueling station may be added to this site. The entire facility is estimated to be approximately 50,000 square feet on one level (collectively the Project).

Bid Related Documents

Download Document

Product Code: 95826

Agency Information

Issuing Agency: County of Calumet

State: Wisconsin

Agency Type: State and Local

Contact: Todd M. Romenesko 206 Court Street, Chilton, Wisconsin, 53014




FREE Market Analysis