Government Contract | Massachusetts
Construction Manager at Risk Services for Woburn Library Addition Project

Bid Information

Bid Alert No: 00000455649

Bid Title: Construction Manager at Risk Services for Woburn Library Addition Project

Agency Bid No. Title: 16-RFQ-015

Received Date: 01/08/2016

Close Date: 01/29/2016

Purchase Type: 18 Months

Delivery Point: Woburn, Massachusetts

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference 01/12/2016 02:00 PM, Warranty Required


Specifications include, but are not limited to:The Construction Manager shall be responsible for complete construction management services for allphases of the project for a guaranteed maximum price. At each phase, the Awarding Authority at its solediscretion will determine whether it will proceed to the next phase or terminate Construction ManagerServices on the project. Certain trade construction work will be procured using procedures similar to theMass General Laws Chapter 149 Filed Sub-bid laws after a pre-qualification process. The procedure isspecified in Chapter 193 of the Acts of 2004 in the new Mass. General Laws Chapter 149A. A detailedscope of services will be included in the Request for Proposals. Services to be provided by theConstruction Manager at Risk include, but are not limited to, the following:A. Pre-Construction (Design) Phase1. Review all documents previously prepared for the Feasibility Study and Schematic Designphase.2. Visit the site and become thoroughly familiar with the existing building and site conditions.3. Review and recommend revisions, if appropriate, to the project master Schedule, ConstructionBudget and permitting plan developed by the Awarding Authority.4. Develop the scope of work and prepare bid packages in concert with the Designer (the AwardingAuthority will provide a template for the Trade bid packages) for each trade to be bid andparticipate in the prequalification and qualification of each of the Trade Contractor and othersubcontractors as defined by law.5. Attend and, if requested by the Awarding Authority, schedule and lead periodic project meetingsand special meetings for the exchange of information concerning the project, and review of designprogress, permits and approvals. All meetings shall be held at a location and time convenient to theAwarding Authority, Designer and Owners Project Manager.

Bid Related Documents

Download Document

Product Code: 95826

Agency Information

Issuing Agency: City of Woburn

State: Massachusetts

Agency Type: State and Local

Contact: Michael Gauthier, Purchasing Department 10 Common St., Woburn, Massachusetts, 01801

Phone: 781-897-5950

Fax: 781-897-5954




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing