Government Contract | Texas
Construction Manager-at-Risk San Pedro Creek Improvements Project

Bid Information

Bid Alert No: 00000475042

Bid Title: Construction Manager-at-Risk San Pedro Creek Improvements Project

Agency Bid No. Title: Not Stated

Received Date: 02/02/2016

Close Date: 03/04/2016

Purchase Type: completion of work, May 30, 2019.

Delivery Point:

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Mandatory 02/18/2016 02:00 PM, Questions Due By 02/19/2016 04:00 PM


Specifications include, but are not limited to:Bexar County and the San Antonio River Authority (RIVER AUTHORITY), in coordinationwith the City of San Antonio, are in the midst of the design phase of the San Pedro CreekImprovements Project (the Project), which will transform the creek to reflect its placein our cultural history, improve its function in flood control, revitalize natural habitat andwater quality, and catalyze economic development. The project will start at the tunnelinlet near Fox Tech High School and wind through the western side of Downtown to thecreeks confluence with the Alazan and Apache Creeks. This historic and once flourishingcreek flows behind the Christopher Columbus Italian Society Hall, past the AlamedaTheater, Spanish Governors Palace, City of San Antonio and Bexar County Offices, pasturban residential housing, and an emerging arts district. It then meanders south ofdowntown through primarily residential neighborhoods before flowing into the SanAntonio River.The CMAR shall have overall responsibility for and shall provide complete PreConstructionPhase and Construction Phase services and shall furnish all materials,equipment, tools and labor as necessary or reasonably inferable to complete the Work,or any phase of the Work, in accordance with the River Authoritys requirements andthe terms of the Contract DocumentsA. Pre-Construction phase services by the CMAR FIRM may include, but will not belimited to, the following: Provide project planning and scheduling for design and construction,including a detailed, milestone-based gantt chart schedule for each phasethat includes blackout dates during which construction activities must beminimized or halted Develop and execute a communication plan that ensures proactive exchangesof information and prompt responsiveness to requests for information fromproject stakeholders, the public and the media, as requested by the RIVERAUTHORITY throughout the duration of the Project

Product Code: 95826

Agency Information

Issuing Agency: San Antonio River Authority (SARA)

State: Texas

Agency Type: State and Local

Contact: Marie LaCroix San Antonio River Authority, 100 E. Guenther Street, San Antonio, Texas, 78204




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing