Government Contract | Florida
Construction Manager-at-Risk Pedestrian Bridge & Boardwalk

Bid Information

Bid Alert No: 00000521262

Bid Title: Construction Manager-at-Risk Pedestrian Bridge & Boardwalk

Agency Bid No. Title: 16-033

Received Date: 03/24/2016

Close Date: 04/21/2016

Purchase Type: Not Stated

Delivery Point:

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Optional 04/01/2016 10:00 AM


Specifications include, but are not limited to:Description: The following Request for Qualifications has been developed to solicit proposals from interested and qualified firms to provide construction management at risk services for the development of a pedestrian bridge over the Gordon River connecting to boardwalks between the Gordon River Greenway and the Jay and Patty Baker (Baker) Park Location. Baker Park is being developed on a separate tract and possibly in phases. Therefore, a lighted pathway between the western boardwalk and Riverside Circle is also a planned part of this project and this solicitation. Background: On June 5, 2013, City Council authorized the purchase of 6.7 acres of property in the amount of $3.0 million from the McCauley-Pulling Family Trust by Resolution 13-13288. This parcel, combined with 12.5 acres of property owned by the City created an opportunity for a new 19.2 acre park. On February 17, 2015, City Council established design criteria for the Gordon River bridge and boardwalks. The criteria set by City Council included concrete girders for the bridge, a 12-foot wide pathway, a wooden (ipe) deck, 4,000 pound maximum live (vehicle) load for the bridge and western boardwalk, top-down construction for the eastern boardwalk, 100-foot wide pilings over the navigational channel. City Council also expressed their interest in expediting the bridge and boardwalk in order to expand the Gordon River Greenway and its great success. On August 19, 2015 City Council selected Cardno, Inc. to provide professional design and permitting services for the Gordon River Pedestrian Bridge & Boardwalk connections from Baker Park to the Gordon River Greenway. On February 16, 2016 Cardno provided the City with the 60% design documents (Appendix A) and the 60% engineers opinion of cost (Appendix B). Around the same time, environmental permits were submitted to the Florida Department of Environmental Protection and the South Florida Water Management District (Appendix C). Scope: The Gordon River Pedestrian Bridge & Boardwalk connector has four major components: 1. 12 feet paved (possibly pervious) pathway (1,294 feet) 2. West Boardwalk (280 feet) 3. Bridge (330 feet) 4. East Boardwalk (274 feet) over environmentally sensitive land

Product Code: 95826

Agency Information

Issuing Agency: City of Naples

State: Florida

Agency Type: State and Local

Contact: Purchasing Division, 735 8th Street S, Naples, Florida, 34102



FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing