Government Contract | California
CONSTRUCTION MANAGER AT RISK (CMAR) FOR FULLERTON CREEK CHANNEL IMPROVEMENT PROJECT

Bid Information


Bid Alert No: 00000449705

Bid Title: CONSTRUCTION MANAGER AT RISK (CMAR) FOR FULLERTON CREEK CHANNEL IMPROVEMENT PROJECT

Agency Bid No. Title: 080-C005672-SL

Received Date: 12/29/2015

Close Date: 03/01/2016

Purchase Type: Not Stated

Delivery Point: John Wayne Airport, California

Delivery Date: Not Stated

Special Notices: Questions Due By 02/02/2016 04:00 PM, Pre-Bid Conference Mandatory 01/27/2016 09:00 AM

Specifications

Specifications include, but are not limited to:The PROJECT will begin with the CMAR in an agency support role for design phase services and willpotentially hold the construction Contract with the AUTHORITY for construction of the PROJECT.Following completion of the Construction Documents (defined in the Model Design Phase ServicesContract in Section VI) and prior to construction, the CMAR may assume the risk of delivering thePROJECT through a Guaranteed Maximum Price (GMP) Contract. The CMAR will be responsible forconstruction means and methods, and may be required to solicit Proposals from subcontractors to performsome of the work. For this PROJECT the CMAR is responsible for self-performing a minimum of 45% ofthe construction work as measured by total contract price for construction.Per Section 3300 of the Public Contract Code, the CMAR is hereby notified that a valid Class A Licenseis required for the duration of the PROJECT and issued by of the State of California, Contractors StateLicense Board.1. Design phase services by the CMAR may include: Participation in design and specification review process; Detailed cost estimating and knowledge of marketplace conditions; Project planning and scheduling; Provide for construction phasing and scheduling that will minimize interruption to operations; Alternate systems evaluation and constructability studies; Advise AUTHORITY on ways to gain efficiencies in project delivery; Advise and initiate procurement of long-lead items; Assist in the regulatory and right-of-way permitting processes; Select subcontractors/suppliers for this project (see Section II through IV); Protect the Owners sensitivity to quality, safety, and environmental factors; Provide CEQA and regulatory permitting data such as detailed description of contract work, hoursof operation and identification of staging areas; Provide public outreach; Constructability review of project design plans; and Meeting with AUTHORITY & PROJECT stakeholders.2. Construction phase services by the CMAR shall include: Implement the Fullerton Creek Improvement Project in its suggested two phases, in sequence,combined together as one project, or as otherwise agreed to between CMAR and Authority; Coordinate with various County of Orange departments, other agencies, City of Buena Park,Caltrans, Southern Pacific railroad, utility companies, stakeholders, residents, etc.; Arrange for procurement of materials and equipment; Schedule and manage site operations; Provide quality controls; Bond and insure the construction; Address all federal, state and local permitting requirements; Provide public outreach; Deal with Owner issues; and Maintain a safe work site for all project participants

Product Code: 95826

Agency Information


Issuing Agency: County of Orange

State: California

Agency Type: State and Local

Contact: Orange Hall of Administration, 333 W. Santa Ana Blvd., Santa Ana, California, 92702

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW