Government Contract | Ohio
Construction Inspection and Construction Administration for the resurfacing (mill and fill) of Chagrin Boulevard. from Richmond Rd. (State Route 175) to the Interstate Route 271 Bridge overpass and the resurfacing of Shaker Boulevard from the Western Corporation Limit to Richmond Road State Route 175 in the City of Beachwood

Bid Information


Bid Alert No: 00000408935

Bid Title: Construction Inspection and Construction Administration for the resurfacing (mill and fill) of Chagrin Boulevard. from Richmond Rd. (State Route 175) to the Interstate Route 271 Bridge overpass and the resurfacing of Shaker Boulevard from the Western Corporation Limit to Richmond Road State Route 175 in the City of Beachwood

Agency Bid No. Title: CUY-422-10.82/Var

Received Date: 11/03/2015

Close Date: 11/23/2015

Purchase Type: Not Stated

Estimated Amount: $1,200,000.00

Delivery Point: Beachwood, Ohio

Delivery Date: Not Stated

Special Notices: Bidder Prequalification

Specifications

Specifications include, but are not limited to:The services include Construction Inspection and Construction Administration for the resurfacing(mill and fill) of Chagrin Boulevard. from Richmond Rd. (State Route 175) to the Interstate Route271 Bridge overpass and the resurfacing of Shaker Boulevard from the Western Corporation Limitto Richmond Road State Route 175 in the City of Beachwood. The construction work will includea minimum of 3 inches of asphalt pavement removal and resurfacing, partial and full depth basepavement and joint repairs, the construction of ADA (Americans with Disabilities Act) compliantcurb ramps, removal and replacement of all curbs and aprons on Shaker Boulevard minor curbreplacements on Chagrin Boulevard, upgrading all traffic signs. Widening Eastbound on ShakerBoulevard at Richmond Road, widening Chagrin Boulevard at Enterprise and the relocation of 1traffic signal pole at Chagrin and Enterprise. The project will also include pavement markings andassociated adjustments to grade of castings. The consultant shall provide construction inspectionand administration services beginning with the preconstruction conference and ending at projectcloseout. Please note that the duration of the project is anticipated to be completed in 30 daysfor Chagrin Boulevard and 90 days for Shaker Boulevard starting in the spring 2016. The majorityof the construction work on Chagrin Boulevard will be performed at night.

Bid Related Documents

Download Document

Product Codes: 92532, 92518

Agency Information


Issuing Agency: City of Beachwood

State: Ohio

Agency Type: State and Local

Contact: 25325 Fairmount Boulevard, Beachwood, Ohio, 44122

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW