Government Contract | Arizona
CONSTRUCTION COST ESTIMATING SERVICES QUALIFIED CONSULTANTS LIST

Bid Information


Bid Alert No: 00000496603

Bid Title: CONSTRUCTION COST ESTIMATING SERVICES QUALIFIED CONSULTANTS LIST

Agency Bid No. Title: 206492

Received Date: 02/26/2016

Close Date: 03/18/2016

Purchase Type: Not Stated

Delivery Point: Pima County, Arizona

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Optional 03/04/2016 10:00 AM, Bidder Preregistration

Specifications

Specifications include, but are not limited to:1. Pre-Construction: Prepare estimates at programming, schematic design, design development, construction documentation and/or bid estimating phases.a. Review and confirm or recommend revisions to the COUNTYS existing Project documentation including conceptual design documents and completed cost estimates, if any.b. Provide construction costs estimates organized into separate trade contracts required for the Project, as approved by the COUNTY and the COUNTYS Project Manager.c. Advise the COUNTY regarding the accuracy of content, scope of work, and the pricing of the cost estimates submitted by specialty consultants and Construction Managers when design development documents have reached completion.d. Together with the Construction Manager, reconcile the estimate with the estimate prepared by the Construction manager.e. Provide a professional level review of all deliverables to assure quality, technical accuracy, and coordination of all documents furnished under this agreement.2. During construction:a. Review contract documents including shop drawings and shop drawing modifications to verify that materials are correctly estimated in change orders and verify that the A/E has approved them be in acceptance with the specifications.b. Review associated MEP and structural engineering shop drawings that may be affected by change order work for coordination and verify the A/E has approved any modifications.c. Prepare estimates for change orders and support change order negotiations.d. Prepare draft A/E change recommendation letters for all change order work describing the necessity of the change and the cost amount for the A/E to review, edit and sign.e. Bundle all supporting data for the change order file, which includes pertinent contract drawing(s), specifications, shop drawings, contractor time and materials tickets.f. Construction schedule review with or without construction expenditure/cash flow projections.g. Construction Manager, General Contractor bid or Guaranteed Maximum Price (GMP) analysis to include, but not limited to, review of general conditions, construction schedules and milestones, documents, bidders (prequalified, solicited, selected), bid package preparation and scope of work documentation, unit prices, and bid analysis and recommendations.h. Prepare estimates as needed during closeout.

Product Code: 96121

Agency Information


Issuing Agency: County of Pima

State: Arizona

Agency Type: State and Local

Contact: Christy Bustillos Design & Construction Division, 130 W. Congress Street, 3rd Floor, Tucson, Arizona, 85701

Phone: 520-724-3727

Fax: 520-724-4434

Email: christy.bustillos@pima.gov

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW