Construct and commission the Event Level Cleaning Office revisions at U.S. Bank Stadium

Bid Information

Bid Alert No: 00000610561

Bid Title: Construct and commission the Event Level Cleaning Office revisions at U.S. Bank Stadium

Agency Bid No. Title: CCD 383

Received Date: 06/27/2016

Close Date: 07/12/2016

Purchase Type: Substantial Completion August 12, 2016

Delivery Point:

Delivery Date: Not Stated


Specifications include, but are not limited to:In 2012, the State of Minnesota enacted 2012 Minnesota Laws, Chapter 299 (the Act) to establish theMinnesota Sports Facilities Authority (Authority) and to provide for the construction, financing, and longterm use of a new stadium (the Stadium) and related stadium infrastructure (the StadiumInfrastructure) as a venue for professional football and a broad range of other civic, community, athletic,educational, cultural and commercial activities.As set forth in the Act, the design, development and construction of the Stadium and the StadiumInfrastructure (collectively, the Project) is a collaborative process between the Authority (the Owner)and Minnesota Vikings Football Stadium, LLC (the Team). To that end, the Authority and the Team haveprepared this Request for Proposals (RFP) for the Event Level Cleaning Office Revisions as depicted inCCD 383. Those who respond to this RFP shall be referred to as a Proposer or Proposers and responsesto the RFP shall be referred to as a Proposal or Proposals.The Event Level Cleaning Office Revisions are located on the Event Level of the Stadium in sector 12 bythe existing cleaning offices and other cleaning spaces. Selected Construction Documents areincorporated within this RFP as Exhibit E CCD 383 (Event Level Operation Revisions). The Project is beingdesigned to meet the standards required for a National Football League (NFL) franchise, as well as otherprogrammatic uses consistent with other multipurpose facilities. The Project will be designed inaccordance with the design requirements set forth in the Act, and such additional standards as establishedby the Authority. Construction of the Stadium and Stadium Infrastructure is now underway withSubstantial Completion of the overall Stadium and Stadium Infrastructure to be achieved not later thanJune 20, 2016 so as to be ready for occupancy in advance of the Minnesota Vikings 2016 NFL season (theRequired Construction Schedule). The Event Level Cleaning Office Revisions substantial completion datemay fall after the Stadiums Substantial Completion date.

Bid Related Documents

Download Document


Download Amendment

Product Codes: 91000, 91400

Agency Information

Issuing Agency: Minnesota Sports Facilities Authority

State: Minnesota

Agency Type: State and Local

Contact: 511 11th Ave South, Suite 401, Minneapolis, Minnesota, 55415