Government Contract | Washington
CHERRY STREET PUMP STATION #7 AND FORCE MAIN UPGRADE

Bid Information


Bid Alert No: 00000486726

Bid Title: CHERRY STREET PUMP STATION #7 AND FORCE MAIN UPGRADE

Agency Bid No. Title: CIP 09-01

Received Date: 02/15/2016

Close Date: 03/03/2016

Purchase Type: Not Stated

Delivery Point: Sumner, Washington

Delivery Date: Not Stated

Specifications

Work under this contract includes installation of a new 12-foot diameter wet well submersible pump station with an initial capacity of 1,180 gpm; installation of owner furnished pumping equipment; conversion of the existing pump station wet well to an upstream inlet manhole; equipment removal, demolition and abandonment of the existing pump station dry well; installation of approximately 2,795 lineal feet of 10-inch diameter HDPE force main using open cut construction techniques; installation of approximately 365 lineal feet of 10-inch diameter HDPE force main with 24-inch diameter steel casing under an active BNSF railroad and E Main Ave. / Traffic Ave. using jack and bore construction techniques; ductile iron yard piping, vault structures and appurtenances; electrical, instrumentation and control equipment to support operation of the new pump station; an emergency generator in a sound attenuated enclosure; falling and placing trees in project vicinity for shoreline habitat enhancement, clearing and grubbing of a partially forested area, and force main and site restoration.No additional specifications were given.

Bid Related Documents

Download Document

Product Codes: 91438, 91340, 91360, 91391, 91345

Agency Information


Issuing Agency: City of Sumner

State: Washington

Agency Type: State and Local

Contact: Public Works Department, 1104 Maple Street, Sumner, Washington, 98390

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW