Government Contract | Texas
Armored car and change order services for PARD locations

Bid Information


Bid Alert No: 00000450537

Bid Title: Armored car and change order services for PARD locations

Agency Bid No. Title: RFP 8600 SMB0102

Received Date: 12/31/2015

Close Date: 01/28/2016

Purchase Type: Contract shall be in effect until June 30, 2017

Delivery Point:

Delivery Date: Not Stated

Specifications

Specifications include, but are not limited to:This Request for Proposals is to establish a contract for professional armored car and change order services for multiple locations in the City of Austin (City). This scope of work establishes the minimum requirements for the armored car Services. 2. SERVICES TO BE PROVIDED BY CONTRACTOR The Contractor shall pick up and receive from the City, or its designated agent, sealed or locked shipments containing currency, coins, checks, securities, and other valuables except cash letters (collectively Property"), and to transport and deliver the same in like condition to the consignee designated by the City specified in Exhibit B. The Contractor may also be required to provide change orders to certain locations specified in Exhibit A. The City reserves the right to add or delete locations throughout the Contract term. 2.1. CONTRACTORS RESPONSIBILITIES 2.1.1. The Contractor shall pickup and provide change orders at times and locations specified on Exhibit A. 2.1.2. The Contractor shall deliver Property to location specified on Exhibit B. Contractor shall deliver before 2:00 PM on the immediate next workday after pickup. 2.1.3. The Contractor shall be required to provide documentation, showing proof of pickup, delivery, and change orders from locations specified on Exhibits A and B to City departmental representatives for each day the services are provided.2.1.4. Documentation shall require the following:2.1.4.1. Location of pickup, with the address2.1.4.2. Contractor's signature for all pickups and change orders2.1.4.3. Delivery destination2.1.4.4. Full value declaration

Product Code: 99010

Agency Information


Issuing Agency: City of Austin

State: Texas

Agency Type: State and Local

Contact: Georgia Billela PO Box 1088, Austin, Texas, 78767

Phone: 512-974-2939

Fax: 512-974-2388

Email: georgia.billela@austintexas.gov

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW