Government Contract | Washington
520 Trail Grade Separation at NE 40th Street

Bid Information

Bid Alert No: 00000565807

Bid Title: 520 Trail Grade Separation at NE 40th Street

Agency Bid No. Title: Not Stated

Received Date: 05/09/2016

Close Date: 05/26/2016

Purchase Type: August 2019 | Construction Completion

Delivery Point:

Delivery Date: Not Stated


Specifications include, but are not limited to:The City of Redmond (Redmond) is soliciting interest from consulting firms with expertise in civil engineering to provide engineering design services for the 520 Trail Grade Separation at NE 40th Street Project. Background The existing 520 Trail through Redmond includes an atgrade crossing of NE 40th Street which requires pedestrians and bicyclists to cross eight lanes of traffic. Both the Redmond Transportation Master Plan and the SR 520 MultiModal Corridor Planning Study identified the need to grade separate the trail and the street to improve pedestrian and bicycle safety and comfort on this important regional trail. Washington States Connecting Washington program has funded this project and it is now ready to begin design. This project will construct an attractive, gradeseparated pedestrian and bike facility for the SR 520 Regional Shared Use Path at the west leg of the NE 40th Street and SR 520 Westbound ramp terminal intersection. Previous plans, some utilities, tentative allowed lane closure, and other related information are posted on

Product Code: 92518

Agency Information

Issuing Agency: City of Redmond

State: Washington

Agency Type: State and Local

Contact: 15670 NE 85th Street, PO Box 97010, Redmond, Washington, 98073



FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing