Government Contract | California
5 Fulton Mid-Rpute Muni Forward Project

Bid Information

Bid Alert No: 00000582240

Bid Title: 5 Fulton Mid-Rpute Muni Forward Project

Agency Bid No. Title: 1290

Received Date: 05/25/2016

Close Date: 06/23/2016

Purchase Type: Not Stated

Delivery Point:

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference 05/25/2016 10:00 AM


Specifications include, but are not limited to:The work to be done under this Contract, located within the City and County of San Francisco, is to install traffic signals, pedestrian islands, traffic circles, pedestrian and transit bulbs along the 5 Fulton line between Stanyan and Laguna streets. Work to be performed under the project includes, but not limited to, the following:A. Extend the existing sidewalk and construct combined 6-inch wide concrete curb and gutter and curb ramps on the southwest side of McAllister St. at Divisadero St. B. Relocate catch basins and support facilities at various locations. C. I n s t a l l n e w t r a f f i c s i g n a l s a t v a r i o u s l o c a t i o n s / i n t e r s e c t i o n s a l o n g M c A l l i s t e r S t . D. C o n s t r u c t t w o t r a f f i c c i r c l e s o n M c A l l i s t e r S t a t S t e i n e r S t a n d B r o d e r i c k S t . E. I n s t a l l n e w 1 0 t h i c k b u s pad along Southwest McAllister St. at Divisadero St

Bid Related Documents

Download Solicitation Notice

Product Codes: 91430, 91347, 91350, 96882

Agency Information

Issuing Agency: City and County of San Francisco

State: California

Agency Type: State and Local

Contact: 875Stevenson Street, Room 420, San Francisco, California, 94103



FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing