Government Contract | Georgia
36 Mo. Contract for GPA Elevated Water Tower Services

Bid Information

Bid Alert No: 00000408574

Bid Title: 36 Mo. Contract for GPA Elevated Water Tower Services

Agency Bid No. Title: 16-LL-10185346

Received Date: 11/03/2015

Close Date: 11/13/2015

Purchase Type: 36 month period

Delivery Point:

Delivery Date: Not Stated


Specifications include, but are not limited to:Scope Of Work: Inspections and maintenance of the GPA elevated water towers. Work includes, but is not limited to,providing all labor, materials, equipment, tools, and services required to provide inspections and maintenance on elevatedwater towers at the following GPA terminals: Tank 1 Garden City Terminal (250,000 gallons) Tank 2 Colonels Island North Side (200,000 gallons) Tank 3 Colonels Island South Side (200,000 gallons)The contractor shall perform, at a minimum, the following tasks:A. Annual Inspection Inspect both interior and exterior surfaces to determine that the structure remains in serviceablecondition. The GPA will need a written report containing narrative and photographic documentation of the tankscondition.B. Interior Clean Outs Every two (2) years, the tank will be completely drained at a mutually agreeable time. Clean andremove all mud, silt, and other accumulations that might be harmful to the tanks interior or its contents using highpressure water washing equipment. After cleaning is completed, the interior will be disinfected in accordance withAWWA C652 prior to returning the tank in service.C. Interior Re-Lining Clean and re-line the interior of the tank as necessary. The predominant method of re-lining will bespot touch-up with compatible ANSI/NSF 61 approved coatings. Touch-up painting will be undertaken to prevent smallareas of corrosion from expanding. Thorough interior cleaning, including abrasive blast cleaning will be scheduled whennecessary, in accordance with ASTM D-3359. Re-lining after such cleaning will include approved AWWA D-102 insidecoating systems with a minimum thickness of at least ten (10) mils.D. Exterior Re-Painting The predominant method of repainting will be spot touch-up and over coating. Touch-up paintingto prevent small areas of corrosion from expanding. Over coating will be scheduled no later than the time when theunderlying paint layer becomes visible in excess of ten percent (10%) of the surface area or when corrosion is present inexcess of one percent (1%) of the surface area. Corrosion will be assessed in accordance with ASTM D-3359. Re-Paintingafter such preparation will include approved AWWA D-102 outside coating systems.E. Repair and Replacement Repair and/or replace damaged or defective steel parts, expansion joints, indicator floats, ventscreens, bracing rods, manholes, grout, and any other component parts therefore.

Bid Related Documents

Download Document

Bid Related Attachments

Download Attachment Download Attachment

Product Codes: 91461, 96878

Agency Information

Issuing Agency: Georgia Ports Authority

State: Georgia

Agency Type: State and Local

Contact: Lisa Lansford, Purchasing Department Purchasing Department, P.O. Box 2406, Savannah, Georgia, 31402

Phone: 912-964-3999

Fax: 912-966-3611




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing