Government Contract | Michigan
2016 and 2017 Construction Materials Testing Services

Bid Information

Bid Alert No: 00000454520

Bid Title: 2016 and 2017 Construction Materials Testing Services

Agency Bid No. Title: 960

Received Date: 01/07/2016

Close Date: 01/27/2016

Purchase Type: Not Stated

Delivery Point: Ann Arbor, Michigan

Delivery Date: Not Stated

Special Notices: Questions Due By 01/20/2016 05:00 PM, Bidder Preregistration


Specifications include, but are not limited to:2016 Street Resurfacing Project This project involves the resurfacing or rehabilitation of several major and minor (local) streets located throughout the City. The work entails partial or full depth removal of the existing HMA pavement, pavement and base repairs, as required, and the placement of one or multiple courses of new HMA. Additional work, as required, includes the removal and replacement of concrete curb and gutter segments, replacement of sidewalk ramps and other related sidewalk work, shoulder work, minor repairs and adjustments to utility structures, placement of permanent pavement markings, and restoration to areas disturbed by these activities. The project will consist of several major and local streets being under construction simultaneously. Therefore, the proposing Firm must have sufficient resources to provide testing staff at these multiple locations as required. The tentative list of streets and respective project limits can be found in Appendix B of this Request for Proposal. It is anticipated that estimated construction quantities willbe available for review by the end of January 2016. It is expected that construction will occur between April and November of 2016. Project Manager: David Dykman, P.E. ( Springwater Subdivision Improvements Project Phase II This project consists of the reconstruction of Redwood Avenue from Cardinal Avenue to Springbrook Avenue; Springbrook from Packard Road to Sharon; and Nordman Avenue from Redwood Avenue to Sharon. In addition to the street reconstruction, the project also includes replacing the existing water main and performing stormwater system improvements, including construction of sand filters within the Redwood Avenue, Springbrook Avenue and Nordman Avenue right-of-way. The project is expected to begin in April of 2016 and be completed by August of 2016. Project Manager: Anne Warrow, P.E. ( Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Project This project involves construction of a new concrete sidewalk along the south side of Ellsworth Road from the end of the existing sidewalk east of Stone School Road easterly to Platt Road, and a new HMA pathway along the east side of Stone School Road from the end of the existing path south of Addington Lane southerly to Morgan Road. Proposed work includes clearing, earthwork, grading and placement of aggregate base, and placement of concrete and HMA materials, as required, to construct approximately 4,920 feet of concrete sidewalk and related ramps, 1,600 feet of HMA path, and 350 feet of timber boardwalk. Presently, preliminary construction plans are available for review. Construction is expected to occur between May and August of 2016. Project Manager: David Dykman, P.E. ( ECT..

Bid Related Documents

Download Document

Product Code: 91275

Agency Information

Note to Vendors To access the agency specs go to: WWW.MITN.INFO. Registration is mandatory and free for BidNet clients. If you are not already registered, login to WWW.BIDNET.COM and select Add eProcurement Systems. For assistance, call BidNets Bid Alert Service Support Center at 1-800-677-1997.

Issuing Agency: City of Ann Arbor/IPT

State: Michigan

Agency Type: State and Local

Contact: 301 E. Huron Street, Ann Arbor, Michigan, 48104



FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing