Government Contract | Florida
1403 S Wabash Avenue, Lakeland

Bid Information

Bid Alert No: 00000492360

Bid Title: 1403 S Wabash Avenue, Lakeland

Agency Bid No. Title: 16-247

Received Date: 02/22/2016

Close Date: 03/16/2016

Purchase Type: Not Stated

Delivery Point: Polk County, Florida

Delivery Date: Not Stated

Special Notices: Site-Walk Mandatory 03/09/2016 10:00 AM, Bidder Preregistration


Specifications include, but are not limited to:1. The Contractor shall begin work after Notice to Commence Services has been issued by the Procurement Division. Work shall only be authorized Monday through Friday between the hours of 7:00 a.m. and 5:00 p.m., excluding County holidays. If the Contractor desires to work outside of the regular hours, a request must be made 48 hours prior to the planned work. The Contractor shall have twenty (20) business days from the date Notice to Commence Services is issued to complete the demolition (Completion Date). All paperwork noted as a part of the Closure Package must be submitted no later than five (5) business days of the Completion Date stated in the Notice to Commence Services. 2. The Contractor must notify Polk County via email with the specific start day. 3. Demolition services must be provided utilizing the wet demo method regardless of the presence of hazardous material. If asbestos material is present, a State licensed Asbestos Contractor must perform the work in accordance with established guidelines for the type of material present. Removal of asbestos containing material must be performed by the Prime Contractor only. This work will not be subcontracted out. 4. Should asbestos be found during demolition when the asbestos survey indicates no asbestos is present within the structure, the Contractor MUST immediately stop work and report the finding to the County and this demolition quote shall terminate. The Contractor shall be paid for all work completed prior to the discovery of asbestos. The County shall issue a new demolition quote solicitation to complete the demolition which shall indicate that asbestos material is present within the structure. 5. The Contractor shall be required to submit copies of all DEP Notices for asbestos abatement and demolition activity. Work dates on the notices must reflect actual work dates for in progress inspections. Any changes to notices must be sent in writing to the DEP and the County before work for that specific notice commences. 6. The Contractor shall remove all debris, trash, man-made items, or building material from site. All utility poles, unless they are marked that they are owned by a utility company; or located in a right-of-way, must be removed. All man-made items should be removed at the completion of the demolition. 7. The Contractor is responsible for observing all federal, state, and county environmental regulations associated with the structure(s) being demolished and cleared from the site. 8. The Contractor must pull all necessary permits for the demolition of the structure(s). As of August 25, 2006, demolition permits are also required for mobile homes. Final closed permits must be submitted as part of the Closure Package described in Instructions, Item 16 9. The Contractor is responsible for utility disconnects. All underground plumbing must be removed. The Contractor shall contact the appropriate power company so that they may disconnect the power source.

Bid Related Documents

Download Document

Product Codes: 91068, 91240, 96878

Agency Information

Issuing Agency: County of Polk

State: Florida

Agency Type: State and Local

Contact: Fran McAskill, Procurement Division 330 W Church St, PO Box 9005, Bartow, Florida, 33831

Phone: 863-534-6757

Fax: 863-534-6789




FREE Market Analysis