Government Contract | Iowa
12-strand armored fiber connection from the Atlantic Middle School to the Cass County Memorial Hospital

Bid Information


Bid Alert No: 00000576919

Bid Title: 12-strand armored fiber connection from the Atlantic Middle School to the Cass County Memorial Hospital

Agency Bid No. Title: 16-047

Received Date: 05/19/2016

Close Date: 06/06/2016

Purchase Type: Not Stated

Delivery Point:

Delivery Date: Not Stated

Specifications

Specifications include, but are not limited to:The purpose of this project is to provide a diverse service via fiber optic communications route into the hospital. This planned route was chosen to maximize the distance from their primary carrier to the planned route of the ICN. Obstacles and the permitting authority may have exceptions to this route. If so, all exceptions must be reviewed by the ICN Outside Plant Manager Mr. Tim Flickinger 515-725-4699 prior to starting construction. Overview of Proposed Route: There is existing duct from the Atlantic Middle School FOTs room to an existing Hand Hole in the South ROW of West 11 th St. This hand hole shall be known as 0+00. There is an existing building entry and metal box on the side of the Middle School Building (See Pictures) The distance from the North wall of the FOTs room to hand hole 0+00 is approximately 145 feet. From 0+00 bore easterly in the south ROW of West 11 th Street to the intersection of Olive Street. (Note: You will be paralleling a MWR/Windstream fiber.) Place a new ICN hand hole. Thence bore northerly to the northwest corner of the intersection of West 10 th Street and Olive Street. Here place a new ICN hand hole. Bore easterly in north ROW of West 10 th Street to the northwest corner of the intersection of West 10 th St and Cherry St. (Note: there is a natural gas main in this same quadrant) Here place a new ICN hand hole. Continue to bore easterly along the north ROW of West 10 th St to a point on the Hospital property between the sidewalk and Hospital Drive. Here place a new ICN hand hole. Then bore north to a point near the existing hospital 4 duct and then bore easterly t o a p o i n t j u s t w e s t o f t h e e x i s t i n g 4 d u c t and place an ICN HH at building entrance. (See pictures) Once inside the north wall of the Materials Management area, a hospital private electrical contractor will place 1-1/4 EMT to the hospital data room. The distance from the north wall of the Materials Management area to the south wall, and thence to the data room is approximately 100 feet. Inside the data room is ceiling mounted racking where the fiber can be routed to the FDP location. The OSP contractor is responsible to pull the fiber through the new hospital provided EMT into the hospital data room and terminate in an ICN provided FDP

Bid Related Documents

Download Document

Bid Related Attachments

Download Attachment

Product Code: 96218

Agency Information


Issuing Agency: Iowa Communications Network

State: Iowa

Agency Type: State and Local

Contact: Sheri Stephens 400 East 14th Street, Des Moines, Iowa, 50319

Phone: 515-725-4747

Fax: 515-725-4774

Email: sheri.stephens@iowa.gov

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW