Government Contract | Idaho
11th AVENUE NORTH RECONSTRUCTION (BIRCH LANE TO CHERRY LANE)

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information


Bid Alert No: 00000506399

Bid Title: 11th AVENUE NORTH RECONSTRUCTION (BIRCH LANE TO CHERRY LANE)

Agency Bid No. Title: 02-1325

Received Date: 03/08/2016

Close Date: 03/17/2016

Purchase Type: Not Stated

Delivery Point: Nampa, Idaho

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference 03/09/2016 02:00 PM, Bid Bond Required: 5%

Specifications

The 11th Avenue North ReconstructionProject is described as a Recycled Asphalt Base Stabilization RABS reconstruction project from Birch Laneto Cherry Lane. The project includes roadway reconstruction at the intersections of Birch and Cherry,Recycled Asphalt Base Stabilization (RABS), roadway excavation and widening along 11th Avenue, newaggregate base, plant mix asphalt pavement, concrete curb, gutter and sidewalk replacement,pedestrian ramp improvements, and the installation of a Rectangular Rapid Flash Beacon. Separatesealed BIDS for the City of Nampa, 11th Avenue North Reconstruction (Birch Lane to Cherry Lane) will bereceived by The City of Nampa at 411 3rd St. So., until 2:00 PM local time on March 17th, 2016 and thenat said office publicly opened and read aloud

Bid Related Documents

Download Solicitation Notice

Product Codes: 91347, 91319, 91396, 91395, 91350

Agency Information


Issuing Agency: City of Nampa

State: Idaho

Agency Type: State and Local

Contact: Nampa City Hall, 411 3rd Street S., Nampa, Idaho, 83651

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW